This was a regular meeting with a full agenda, including three substantive public hearings on active transportation projects. The chair opened by acknowledging that the previous meeting ran too long and asked members to keep comments focused.
General Public Comment
Pete Gangitano announced two upcoming community events: the Second Annual Petaluma Holiday Lighted Bike Ride on December 22nd (starting at Aqus Café at 5:30 p.m., five flat miles, family-friendly), and a community gingerbread showcase entry modeled on the proposed Fifth Street Neighborhood Greenway.
Approval of Minutes — November 1, 2023
Minutes were accepted as presented without changes. No vote was recorded; acceptance was by consensus.
Lynch Creek Trail Improvements (Edith Street to North McDowell Blvd.)
Staff engineer Ken presented plans to close what he called the last major gap in Lynch Creek Trail and improve existing degraded sections. The project covers two segments:
North McDowell to Holly Park: The existing asphalt path has significant cracking and drainage problems. The plan calls for crack sealing, application of a geotextile fabric (P-mat), and a new asphalt overlay. Graffiti removal, improved drainage, wayfinding signage, and striping (including speed-calming markings similar to those used on I Street) are also planned. The problematic intersection at North McDowell will receive striping and minor asphalt improvements to better accommodate cargo bikes and trailers.
Payran to Edith Court (toward Riverbend/Lakeville): This segment will receive an 8–10 foot concrete path, ADA-accessible ramp up to Payran Street, stabilized shoulders, benches, trash cans, and solar lighting similar to the Riverbend installation. The North McDowell/Lynch Creek Trail crossing itself is a separate funded project (a contract with MTC has been signed) that will examine signal improvements, a potential overpass, and possibly an underpass beneath Highway 101.
Key committee feedback included:
One public commenter urged that the Lynch Creek Trail crossing of North McDowell eventually be designed to give priority to pedestrians and cyclists over vehicles, consistent with the city's draft climate action plan. He also requested recycling containers alongside any new trash cans.
Vote: No formal vote; this was a feedback/advisory item.
Frontage Improvements on North McDowell Blvd. and Corona Road — Meridian and Petaluma North Station Projects
Staff planner Bjorn presented conceptual options for pedestrian and bicycle frontage improvements along North McDowell Boulevard and Corona Road, associated with two advancing projects: the Denko affordable housing development (131 units, already approved) and SMART's new Petaluma North Station. SMART has already awarded a contract to build a multi-use trail extension from South Point Boulevard to Penngrove, including a new signalized crossing of North McDowell and perpendicular rail crossing ramps modeled on improvements in San Rafael.
The core question for PBAC: With approximately 16 feet of frontage to work with along North McDowell, should the city install:
Committee discussion was substantive. Most members ultimately supported Option 1, reasoning that:
For Corona Road, staff sought the same directional feedback. The committee supported applying the multi-use trail concept there as well, with one public commenter (a nearby resident and bike commuter) endorsing Option 1 on both streets while suggesting a different treatment on the far (westbound) side of Corona.
Additional concerns raised:
Vote: No formal vote; this was a feedback/advisory item.
Draft Active Transportation Project Maps
Staff presented three draft maps — an envisioned bike network, a sidewalk gap and trail network map, and a trail-only network — for committee and public feedback. This is part of the broader Active Transportation Plan (ATP) update process.
Key themes from committee discussion:
Two public commenters echoed the need for a complete, integrated network to achieve mode shift targets, and noted the difficulty of visualizing how trail segments connect across major arterials.
Staff noted the plan will go to PBAC, Planning Commission, and the Recreation, Music and Parks Commission before going to City Council, likely spring 2024. A priority project list will be developed in time to submit a package grant application to the Active Transportation Program (ATP state funding cycle) in summer 2024.
Vote: No formal vote; this was a feedback/advisory workshop item.
Staff Updates — December 2023
Key Takeaways
AI-generated summary from voice-to-text transcript. Not the official record. Verify important details with the source documents linked above.
What happened at this meeting
Approval of Minutes for the meeting of November 1, 2023.
Review and Provide Feedback on Lynch Creek Trail Improvements (Edith St. to N.
Review and Provide Feedback on Frontage Improvements on N. McDowell Blvd. and Corona Rd. Associated with Meridian and Petaluma North Station Projects
Review and Provide Feedback on Draft Active Transportation Project Maps
Staff Updates – December 2023
Agenda items (5)
What happened
Minutes of the Regular Meeting of November 1, 2023 were approved as presented.What happened
Ken Eichstaedt presented on Lynch Creek Trail Improvements (Edith St. to N. McDowell Blvd.). Public commenter Pete Gang spoke during public comment. Committee members provided feedback including recommendations for bike/pedestrian turn indicators at Washington to Payran, wayfinding signs after the bridge, traffic calming measures at Payran, and encouragement for future connections to Washington Creek and Petaluma River walkways.What happened
Bjorn Griepenburg presented on Frontage Improvements on N. McDowell Blvd. and Corona Rd. associated with Meridian and Petaluma North Station Projects. Public commenter Paul Russell spoke during public comment. Committee members reached consensus to support Option 1 and recommended striping on N. McDowell Blvd., wayfinding signage, traffic calming solutions, lighting along Corona Road, and consideration of yield signage.What happened
Bjorn Griepenburg presented on Draft Active Transportation Project Maps. Public commenters David Felix and Pete Gang spoke during public comment. Committee members provided extensive feedback including requests for more lighting, improved visibility of green bikeways, clarity on protected bike network, better wayfinding signage, numerous specific corridor and intersection improvements, and recommendations to underground utilities and extend neighborhood greenways.What happened
Bjorn Griepenburg provided Staff Updates for December 2023 as noted in a presentation document posted to the Agenda website.Verbatim transcript available